Hey guys!
Exciting news, So after the last couple weeks fighting with the weather, Castrol has really gotten some great work done. The following changes have been made, and i may even be missing some.
-Turn 1/2 wall has been pushed back as far as possible, now with room for a gravel trap.
-Turn 3 wall has been pushed back, and bales are also being added prior to the wall
-Turn 14 to turn 1 wall has been moved back towards the drag strip making the straight wider, and we have special side impact air fence on the way to line the exit of turn 14
- the concrete blocks on the outside of turn 4 have been removed completely, and replaced by a light fence WAY back which will have bales/bottle bags lining it.
Pics as follows, more updates to come once the bails/bottles are placed, some lines get painted, and we place some more gravel.
Exciting news, So after the last couple weeks fighting with the weather, Castrol has really gotten some great work done. The following changes have been made, and i may even be missing some.
-Turn 1/2 wall has been pushed back as far as possible, now with room for a gravel trap.
-Turn 3 wall has been pushed back, and bales are also being added prior to the wall
-Turn 14 to turn 1 wall has been moved back towards the drag strip making the straight wider, and we have special side impact air fence on the way to line the exit of turn 14
- the concrete blocks on the outside of turn 4 have been removed completely, and replaced by a light fence WAY back which will have bales/bottle bags lining it.
Pics as follows, more updates to come once the bails/bottles are placed, some lines get painted, and we place some more gravel.